Construction Solutions Simplified®
Construction Solutions Simplified®
Case Studies
We believe that time invested upfront saves money during construction. That’s why, on every project, we emphasize the importance of the planning stage. It allows us to ensure that subcontractors have a full understanding of how the building will be used and how people and equipment will interact with it.
CVS
CVS Controls’ new facility builds on the existing structure and expands it into a modern warehouse featuring 100,000 SF and a two storey office space.
Sierra
York Construction is constructing a 350,000 SF freezer facility in Balzac, Alberta, with over 80,000 pallet position and multiple temperature zones.
SWIFT
CVS
SWIFT
York Construction built an office, lay down yard and warehouse for SWIFT Oilfield Services.
DNOW
DNOW occupies a large facility built by York Construction in South Edmonton which includes office, a large warehouse and a dedicated lay-down yard for their inventory.
STEM Gym
York Construction is building a gymnasium for a client for a chartered high-school.
Yokohama
York Construction built a 100,000 SF tire storage facility for Yokohama in the Edmonton market.
Saskatoon IB
York Construction was given the opportunity to build “on-spec” for a development in Saskatoon.
Pioneer Skies
Neque porro quisquam est qui dolorem ipsum quia dolor sit amet, consectetur, adipisci velit.
- Pearse Cole
DOW Path2Zero